160*63mm iron U bar hot rolled steel channel bar for construction
|
post-tensioned anchorages u bar c purlin and z purlin/Prime hot rolled mild steel u bar |
|
|
160*63*8.5mm |
|
|
6m/12m |
|
|
304,304L,316,316l,Q235,Q345,Q195 |
|
|
1.Industrial structure of the steel structure bearing bracket. 2.Underground engineering steel pile and retaining structure. 3.Petrochemical and electric power and other industrial equipment structure 4.Large span steel bridge components 5.Ships, machinery manufacturing frame structure 6.The train, automobile, tractor beam bracket 7.Port of conveyor belt, high speed damper bracket |
|
|
10-15 days after received the deposit |
|
|
10T |
|
|
5000t/ month |
|





A:One is 30% deposit by TT before production and 70% balance against
copy of B/L; the other is Irrevocable L/C 100% at sight.
A:(1)We are specialized in this industry for more than 25 years
(2) We are the gold supplier on Alibaba com
A: 25Tons is ok,because this can full one 20ft container
A:Regular lead time is 15 days after received deposit
Δημοφιλείς Ετικέτες: 4 inch i-beam astm a656gr80, China 4 inch i-beam astm a656gr80 manufacturers, suppliers





